{"id":"29084","url":"https://navtex.online/messages/29084","station":{"id":"navtex-nl-netherlands-coastguard-radio-p","name":"Netherlands Coastguard Radio (PBK) NAVTEX [P]","navarea":"I"},"header":{"letter":"P","subject":"A","subjectName":"Navigational warning","serial":"50"},"refs":[],"firstSeen":"2026-08-17T02:36:33.000Z","lastSeen":"2026-08-17T02:36:33.000Z","copies":1,"sources":1,"quality":0.9432624,"text":"ZCZC PA50\n07/05/2026 0820 _+\n,5.037/2026\n7_'_*3:5: DRI\nLING OPERATIONS\n\nADVISE TO ALL MARINERS THAT THE DRILLI\n_P SANTORINK ILL YERFORM DRILLING OPERATION FROM 06 MAY TILL 30 NOVEMBER 2026 \nIN POSITION:\n3 10.-7 '_80 '-95948,8 8' 3'(9453$ _6 4 OSV LUNDSTROM VID  SWIFT TIDE HIGHLAND CHIE_TAIN AND STEPD_M_S__PM_F_PSJMYPMYP_CPJHPWMHZM_FHFMM_F__SAFE DISTANCE OF 1 NM FRO_DRILLING _HIP SANTORINI\nST_N_ART VESSEL LIGHTS AND SHAPE- VESS_NGAGED IN UNERWATER OPERATION RESTRICTED IN ABILITY TO MANEUVER.  \n\nISR AUTH.\nNNNN","plain":{"title":"Netherlands Coastguard Radio (PBK) NAVTEX [P] · Navigational warning · No. 50","issued":null,"text":"07/05/2026 0820 ▯+\n,5.037/2026\n7▯'▯▯3:5: dri\nLing operations\n\nAdvise to all mariners that the drilli\n▯P santorink ill yerform drilling operation from 06 May till 30 november 2026 \nIn position:\n3 10.-7 '▯80 '-95948,8 8' 3'(9453$ ▯6 4 osv lundstrom vid  swift tide highland CHIE▯TAIN and STEPD▯M▯S▯▯PM▯F▯PSJMYPMYP▯CPJHPWMHZM▯FHFMM▯F▯▯SAFE distance of 1 nautical miles FRO▯DRILLING ▯HIP santorini\nST▯N▯ART vessel lights and shape- VESS▯NGAGED in unerwater operation restricted in ability to maneuver.  \n\nIsr auth.","summary":"Ling operations · Advise to all mariners that the drilli"},"positions":[],"status":"unknown","cancelledAt":null,"cancelledBy":null,"official":null,"change":"297707","versions":[{"source":"navtex-lv","receivedAt":"2026-08-17T02:36:33.000Z","lastAt":"2026-08-17T02:36:33.000Z","repeats":1,"complete":true,"errorMarks":24,"primary":true,"text":"ZCZC PA50\n07/05/2026 0820 _+\n,5.037/2026\n7_'_*3:5: DRI\nLING OPERATIONS\n\nADVISE TO ALL MARINERS THAT THE DRILLI\n_P SANTORINK ILL YERFORM DRILLING OPERATION FROM 06 MAY TILL 30 NOVEMBER 2026 \nIN POSITION:\n3 10.-7 '_80 '-95948,8 8' 3'(9453$ _6 4 OSV LUNDSTROM VID  SWIFT TIDE HIGHLAND CHIE_TAIN AND STEPD_M_S__PM_F_PSJMYPMYP_CPJHPWMHZM_FHFMM_F__SAFE DISTANCE OF 1 NM FRO_DRILLING _HIP SANTORINI\nST_N_ART VESSEL LIGHTS AND SHAPE- VESS_NGAGED IN UNERWATER OPERATION RESTRICTED IN ABILITY TO MANEUVER.  \n\nISR AUTH.\nNNNN"}]}