ZCZC KA40 CASQUETS - JERSAY - PIROU BEGINNING AUGUST 22 2025 AND UNTIL SEPTEMBER 1 2025 CERES IS AUTHORIZED TO CONDUCT A GEOPHYSICAL SURVEY CAMPAIGN IN THE VICINITY OF THE NORMANDY BQ AND NORMANDY 2 SUBMARINE CABLES BETWEEN JERSAY AND PORTBAIL AND NORMANDY 3 BETWEEN JERSEY AND PIROU FOR THE BENEFIT OF GUERSEY ELECTRICITY. THE CAMPAIGN WILL BE CARRIED OUT WITHIN THE PERIMETERS DETERMINED BY THE GEODESIC COORDINATES EXPRESSED IN THE WGS 84 SYSTEM WHICH ARE SHOWN BELOW: - A: 49 15.46 - 1 50.48 - B: 49 18.45 - 1 41.95 - C: 49 17.47 - 1 41.33 - D: 49 14.57 - 1 50.07 - E: 49 13.16 - 1 50.07 - F: 49 11.85 - 1 36.37 - G: 49 10.90 - 1 36.04 - H: 49 11.92 - 1 50.13. NAVIGATE WITH CAUTION NNNN