Astrakhan NAVTEX [W]
Navigational warningOriginal
ZCZC WA73 041140 UTC MAR 26 COASTAL WARNING ASTRAKHAN 81 PORT MAKHACHKALA 1. DECLARE DRAFT OF WATER INSTALLATION A. PETROPIER 1 BERTH NO 1 4.8 METERS B. PETROPIER 1 BERTH NO 2 5.1 METERS C. PETROPIER 2 BERTH NO 3 5.4 METERS D. PETROPIER 2 BERTH NO 4 5.4 METERS E. PETRBERTH NO 5 2.1 METERS F. BERTH SHIPS TYPE +- + NO 1 3.9 METERS G. RAILWAY FERRY BERTH NO 2 3.9 METERS H. GRAIN BERTH NO 3 2.80 METERS I. BERTH GENGRUZOV NO 4 4.5 METERS J. BERTH GENGRUZOV NO 5 4.5 METERS K. BERTH GENGRUZOV NO 6 4.5 METERS L. BERTH NO 1 BERTHING QUAY 3.1 METERS M. WATER AREA SEAPORT OIL HARBOR 5.4 METERS N. WATER AREA SEAPORT DRY CARGO HARBOR NEW BASIN 4.5 METERS O. WATER AREA SEAPORT DRY CARGO HARBOR OLD BASIN 4.5 METERS P. ACCESS CANAL OF OIL HARBOR 5.0 METERS Q. ACCESS CANAL OF DRY CARGO HARBOR 4.5 METERS 2. CANCEL 285/25 AND THIS PARA= NNNN
Readable
Issued 4 Mar 2026 11:40 UTC
4 Mar 2026 11:40 UTC
Coastal warning astrakhan 81
Port makhachkala
1. Declare draft of water installation
A. Petropier 1 berth no 1 4.8 meters
B. Petropier 1 berth no 2 5.1 meters
C. Petropier 2 berth no 3 5.4 meters
D. Petropier 2 berth no 4 5.4 meters
E. Petrberth no 5 2.1 meters
F. Berth ships type +- + no 1 3.9 meters
G. Railway ferry berth no 2 3.9 meters
H. Grain berth no 3 2.80 meters
I. Berth gengruzov no 4 4.5 meters
J. Berth gengruzov no 5 4.5 meters
K. Berth gengruzov no 6 4.5 meters
L. Berth no 1 berthing quay 3.1 meters
M. Water area seaport oil harbor 5.4 meters
N. Water area seaport dry cargo harbor new basin 4.5 meters
O. Water area seaport dry cargo harbor old basin 4.5 meters
P. Access canal of oil harbor 5.0 meters
Q. Access canal of dry cargo harbor 4.5 meters
2. Cancel 285/25 and this para=